To build, operate, and maintain the Agra Etawah Bypass NH 2 Project, the NHAI and AETPL (AE Tollway Private Limited), an SPV of IRB Infrastructure Developers Ltd., entered into a Concession Agreement on September 1, 2015. Long after the designated date, the Project's concession term is still in effect. During this time, the concessionaire is allowed to collect the suggested client expense from the traveling public.
AETPL has been given permission to extend six lanes on a BOT or DBFOT basis to a 124.52 km section of Uttar Pradesh's NH 2.
The section of NH 2 between kilometers 199.66 and 323.525 is part of the Agra Etawah Toll Road Project.
A list of the project's features is provided below:
six-lane highway with a length of 124.52 kilometers
Of the 750 Lane kilometer Administration road, 84.725 km
Slip road measuring 30.282 km, with three substantial additions
30 little additions
Seven in the sky
Seven rail tracks must travel through 3.08 km of obstructions due to turbulence.
The 44.68 km of the route is illuminated by the lamps.